Industry NewsThird Lake DevelopmentCentro StorageSt Petersburg

Third Lake Plans 858-Unit Centro Storage Conversion in St. Petersburg's Sky Town District by 2028

The Skyway Marina District adaptive reuse adds climate-controlled capacity near a residential master plan Altis Cardinal is still building. Elm Builders, Stantec, and Designhaus Architecture join the development team.

·4 min read·by David Cartolano·Source: Self Storage List

Third Lake Development will convert an 87,705-square-foot former office building in St. Petersburg's Sky Town district into Centro Storage, a 858-unit climate-controlled facility slated for 2028 completion, Self Storage List reported November 10, 2026. Third Lake paid $6.16 million to acquire the asset from master developer Altis Cardinal.

The project is adaptive reuse inside a live residential master plan, not a greenfield cube on exurban farmland. It belongs on the same Florida calendar as industrial land trading near Daytona and Fortified Solar's Rusk, Texas, portfolio buy, but the economics are office-to-storage cap-ex, not coastal portfolio NOI.


What Is the Site and Program?

Self Storage List's November 10 development brief lists hard counts:

ElementDetail
BrandCentro Storage
SponsorThird Lake Development
LocationSky Town, Skyway Marina District, St. Petersburg, FL
Existing building87,705 SF, 3 stories
Planned product858 climate-controlled units
Target completion2028
Land purchase$6.16M from Altis Cardinal

Climate-controlled density in a three-story former office shell is a Sun Belt replay of PrimeSpace's Pier 40 CubeSmart conversion, though Philadelphia's deal was 1,486 units across a port authority building with explicit take-out financing. St. Petersburg's story is earlier stage: development team named, opening date two years out.


Who Is on the Development Team?

Third Lake lined up a full vertical bench:

  • General contractor: Elm Builders
  • Engineering: Stantec, Bliss & Nyitray
  • Architect: Designhaus Architecture

That roster signals entitlement-complete or near-complete planning: you do not publish MEP and structural partners on a rumor. For operators, it also implies institutional lender diligence will focus on floor loads, elevator counts, and climate-control zoning for humidity-heavy coastal markets.

Altis Cardinal founder Frank Guerra told Self Storage List the storage building is an additional amenity for Sky Town's residential community. Mixed-use master plans increasingly treat storage as infrastructure (moving, boating, seasonal gear) rather than a standalone strip-center tenant.


Why Adaptive Reuse Here Instead of New Construction?

Sky Town already bundles housing and commercial nodes. Converting existing office gross area:

  • Avoids some greenfield permitting fights seen in Atlanta's storage moratorium debates
  • Reuses parking and access cores
  • Aligns with 2020s office vacancy reality on secondary Florida employment corridors

The trade-off is conversion basis. $6.16 million land/building basis for 87,705 SF is roughly $70 per foot before vertical improvements, cheap relative to trophy coastal dirt but not free once 858 doors need corridors, elevators, and HVAC plant.


How Should Operators Underwrite Comp Impact?

Tampa Bay is not one submarket. Skyway Marina sits southwest of downtown St. Petersburg, tied to marina and gateway housing growth rather than Westshore office towers.

Watch:

  • Population growth in Sky Town phasing (residents are captive demand)
  • Existing climate-controlled competitors within a 3-mile ring
  • Insurance and wind-load costs that hit Florida construction budgets harder than Texas infill trades

Institutional investors reading Yardi Matrix street-rate softness should still model new 2028 supply in localized nodes, even when national delivery forecasts fall.


The Numbers Worth Writing Down

  • Report date: November 10, 2026
  • Building: 87,705 SF, 3 stories
  • Planned units: 858 climate-controlled
  • Opening target: 2028
  • Acquisition: $6.16M from Altis Cardinal
  • GC: Elm Builders; engineers Stantec, Bliss & Nyitray

Master Plans Are the New Entitlement Shortcut

Centro Storage is less about 858 abstract doors and more about where those doors land: inside Altis Cardinal's residential machine with political cover as an amenity.

Developers elsewhere should ask whether their city council sees storage as necessary infrastructure or last-mile industrial. Answer that before buying office carcasses. Questions on feasibility modeling? /contact.


Sources

Frequently Asked Questions

What is Third Lake building in St. Petersburg?

Third Lake Development is converting a former office building into Centro Storage at the Sky Town project in St. Petersburg's Skyway Marina District. The November 10, 2026 report cites 87,705 square feet, three stories, and 858 planned climate-controlled units with completion expected in 2028.

How much did Third Lake pay for the Sky Town building?

Self Storage List reported that Third Lake acquired the property from Altis Cardinal for $6.16 million. The seller is the master developer of the broader Sky Town mixed-use district.

When will Centro Storage open?

The briefing targets 2028 completion. Third Lake has named Elm Builders as general contractor and Stantec, Bliss & Nyitray, and Designhaus Architecture as engineers and architect, suggesting early design and entitlement work is underway.

Why convert office to storage in Sky Town?

Altis Cardinal's Frank Guerra welcomed the project as an amenity for Sky Town's growing residential community. Adaptive reuse can be faster than greenfield storage when zoning already permits commercial uses and parking infrastructure exists.

How does this compare to other Florida storage news in November 2026?

The same week, industrial investors traded large logistics land near Daytona on I-4 and I-95, while self-storage REITs emphasize same-store rate and occupancy discipline. Centro Storage adds Tampa Bay metro climate-controlled supply tied to a master-planned residential node rather than a standalone greenfield pad.