RegulatoryBurlingtonVermontAdaptive Reuse

Burlington Owner Seeks Zoning for City Place Storage in Vacant Former Macy's

Adaptive reuse fights are not limited to downtown offices. Burlington's ex-department store, recently a high school, may become climate-controlled storage while officials push for housing or convention uses.

·3 min read·by David Cartolano·Source: WCAX

Don Sinex filed to convert Burlington's vacant former Macy's at 67 Cherry Street into City Place Storage, a 150,000-square-foot interim self-storage use, WCAX reported November 19, 2026. City staff and council members have not welcomed the idea, preferring housing, retail, or a convention center on the downtown block.


What Is Sinex Proposing on Cherry Street?

The plan is light-touch adaptive reuse: storage modules inside a department store shell that already served as Burlington High School for six years.

ItemDetail
Address67 Cherry Street, Burlington, VT
Size cited~150,000 SF
Prior usesFilene's/Macy's anchor; temporary high school
Vacant sinceJuly 2026 (school exit)
Proposed brandCity Place Storage
Structural changesNone planned (interim use)
FiledNovember 2026

Sinex told WCAX an empty building helps no one and that climate-controlled storage is missing downtown today.


Why Are Burlington Officials Resisting Storage?

Bill Ward, Burlington's director of permitting and inspections, told Daily Burlington the use is not the best for Cherry Street and that the city would probably discourage it.

Mayor Emma Mulvaney-Stanak said she wants a more active long-term program and floated a convention center. Sinex called that an excellent idea but said private developers cannot finance convention halls alone.

The tension mirrors national debates when Atlanta extended institutional storage moratoriums while sponsors still seek adaptive paths into storage shells.


How Does Interim Storage Differ From Ground-Up Zoning Fights?

Sinex's interim framing matters legally and politically.

  • No demolition means faster activation if zoning approves
  • Removable units promise reversion to housing or mixed use
  • Downtown vacancy since July pressures the city to accept any tax-paying use

Compare U-Haul's Burlington bakery-site proposal on Riverside Avenue: permanent purpose-built storage with hearings and neighborhood scrutiny.

Cherry Street is a placeholder play, closer to office-to-storage debates in smaller cities than to a million-square-foot REIT development.


What Should Northeast Operators Watch?

Three policy signals sit in the WCAX and ISS reporting.

First, school reuse timelines create 18-to-72 month gaps where storage is the only low-capex option. Expect more institutional buildings to hit zoning boards while districts rebuild campuses.

Second, climate control is the public rationale. Northern urban sites without HVAC storage leave money on the table when households stay put and clutter grows.

Third, if Burlington denies storage, the block stays vacant. That risk may push council toward conditional approval with sunset dates, a model other New England towns could copy.


The Numbers Worth Writing Down

  • Building size: ~150,000 SF
  • High school tenure: 6 years in the Macy's shell
  • Vacant since: July 2026
  • Macy's closure: 2018
  • WCAX publish date: November 19, 2026
  • ISS zoning update: November 23, 2026

Empty Blocks Force Ugly Choices

Sinex is not pitching storage as Burlington's destiny. He is pitching cash flow and security on a 150,000-square-foot hole steps from Church Street.

Cities that reject storage without funding housing conversions should expect more interim storage petitions. The alternative is not a convention center. It is continued vacancy.


Sources

Frequently Asked Questions

What is proposed for Burlington's former Macy's building?

Owner Don Sinex filed to change the zoning classification from department store to self-storage for City Place Storage at 67 Cherry Street. WCAX on November 19, 2026 said the plan uses the existing 150,000-square-foot shell without structural alterations.

Why is Burlington's Macy's building vacant?

Macy's closed in 2018 after the Burlington Square Mall declined. The district used the building as Burlington High School for six years during PCB remediation at North Avenue. WCAX said the school moved out and the Macy's site has been empty since July 2026.

Is the City Place Storage plan permanent?

Sinex told WCAX the storage use is interim until longer-term redevelopment. Because it is temporary, the proposal avoids structural changes and relies on removable storage modules in large and small sizes.

How did Burlington officials react to the storage proposal?

Daily Burlington quoted permitting director Bill Ward saying the use is not the best fit for the area. Mayor Emma Mulvaney-Stanak said she hopes for a more active long-term use and mentioned a convention center, which Sinex said would require broad public financial support.

Does downtown Burlington already have climate-controlled storage?

Sinex told WCAX he believes there is demand for climate-controlled storage downtown and that none exists in the downtown area today, framing the proposal as filling a tenant gap on an otherwise empty block.