# Chaussea Breaks Ground on 48,000 sqm SSI Schäfer Automated Warehouse in Trémery, France

> The Moselle project adds SSI Exyz stacker cranes, Flexi Shuttle, case picking robots, and on-site Schäfer technicians to support e-commerce and store fulfillment for roughly 650 stores in France, Belgium, and Luxembourg.

- URL: https://www.yourcaio.co/news/chaussea-tremery-48000-sqm-ssi-schaefer-warehouse-november-2026
- Published: 2026-11-15
- Author: David Cartolano (https://www.yourcaio.co/about)
- Category: Industry News
- Property type: Industrial
- Tags: Chaussea, SSI Schaefer, Warehouse Automation, France Logistics, Distribution Center
- Source: [SSI Schäfer](https://supply-news.com/2026/11/11/chaussea-tremery-ssi-schaefer-automated-warehouse/)

## Key Takeaways

- Chaussea broke ground November 10, 2026 on a 48,000-square-meter automated warehouse in Trémery, Moselle, France, with SSI Schäfer equipping the site for a planned 2028 opening per trade reports in early November 2026.
- SSI Schäfer specifications include 45,000 pallet high-bay locations with 12 Exyz stacker cranes, Flexi Shuttle with 33 shuttles across six aisles and more than 126,000 carton, tote, and tray locations, plus robotic case picking with three Sequence Towers.
- Reports attribute roughly €100 million in project budget to support e-commerce and store networks across about 650 stores in France, Belgium, and Luxembourg, adding to roughly 66,000 square meters Chaussea already operates in Trémery.
- SSI said about ten technicians will be stationed permanently on site for maintenance, signaling a long-term service contract beyond equipment install.
- The project sits alongside November automation headlines including Gideon autonomous forklifts and Toyota's Danfoss intralogistics retrofit in Denmark.

**Chaussea broke ground November 10, 2026** on a **48,000-square-meter** automated distribution center in **Trémery, France**, with **SSI Schäfer** as technology partner and **2028** targeted opening. Budget estimates near **€100 million** add robotics density to an existing **~66,000 sqm** logistics cluster serving **~650** stores.

European retail fulfillment is still **capex-heavy** while U.S. investors argue about [industrial absorption prints](https://www.yourcaio.co/news/lee-associates-q3-industrial-absorption-november-2026). Chaussea's bet is **automation scale**, not incremental shelving.

---

## What Automation Stack Did SSI Disclose?

| Component | Scale |
|-----------|-------|
| High-bay pallets | **45,000** locations, **12** Exyz cranes |
| Flexi Shuttle | **33** shuttles, **6** aisles, **126,000+** carton/tote/tray slots |
| Case picking | **3** Sequence Towers (robotic palletize/depalletize) |
| Software | **Wamas** |
| On-site service | **~10** permanent SSI technicians |

Permanent technicians telegraph **uptime SLAs** baked into operating budget. This is not install-and-exit hardware.

---

## Why Trémery Again?

Chaussea already runs **~66,000 sqm** in Trémery (Moselle). Doubling down avoids greenfield land search and leverages labor pools trained on existing flows.

Footwear SKUs need **split-case** accuracy and seasonal surge capacity. Shuttle plus case-picking robots target **e-commerce parcel** and **store replenishment** on one campus.

---

## The Numbers Worth Writing Down

- Groundbreaking: **November 10, 2026**
- Building: **48,000 sqm**
- Budget: **~€100M** (reported)
- Opening: **2028**
- Stores served: **~650** (France, Belgium, Luxembourg)

---

## Automation CapEx Is Still a Retail Moat

Chaussea is spending like logistics is **competitive advantage**, not back-office cost.

Watch **2028** opening against [Prologis development economics](https://www.yourcaio.co/news/prologis-27-percent-replacement-rent-warehouse-development-november-2026) to see whether automation-rich sites earn rent premiums. Questions: [/contact](https://www.yourcaio.co/contact).

---

## Sources

- [Chaussea Breaks Ground on 48,000 sqm SSI Schäfer-Automated Warehouse in France](https://supply-news.com/2026/11/11/chaussea-tremery-ssi-schaefer-automated-warehouse/), Supply News, November 11, 2026
- [Chaussea groundbreaking coverage](https://www.ssi-schaefer.com/en-us/newsroom), SSI Schäfer news summaries, November 2026

## Frequently Asked Questions

### When will Chaussea's Trémery warehouse open?

Trade coverage tied to the November 10, 2026 groundbreaking cites a 2028 service date for the 48,000-square-meter automated platform in Trémery, Moselle, France, equipped by SSI Schäfer.

### What automation will SSI Schäfer install?

SSI Schäfer described a high-bay store with 45,000 pallet locations and 12 Exyz cranes, Flexi Shuttle with 33 shuttles and 126,000+ carton locations, robotic case picking with three Sequence Towers, and Wamas warehouse software.

### How much is Chaussea spending on the project?

Supply News and SSI Schäfer trade summaries cite about €100 million in budgeted investment to expand logistics supporting e-commerce and approximately 650 retail stores.

### Does Chaussea already operate logistics in Trémery?

Yes. Reports say Chaussea already runs about 66,000 square meters of logistics space in Trémery, making the new building a major expansion of an existing cluster.

### Why does this matter for industrial investors?

Large European retailers continue committing nine-figure capital to automated fulfillment even as U.S. investors debate warehouse supply. Automation depth affects labor costs, throughput, and obsolescence risk on legacy sites.

---

Cite as: David Cartolano, "Chaussea Breaks Ground on 48,000 sqm SSI Schäfer Automated Warehouse in Trémery, France," YourCAIO.co, 2026-11-15, https://www.yourcaio.co/news/chaussea-tremery-48000-sqm-ssi-schaefer-warehouse-november-2026
